The Project includes construction of 3 oil fred steam operated units of 210 MW each. Muzaffargarh being in the seismic zone, the design of monstrous powerhouse and other buildings was more complex and complicated. The four tier inspections and supervision by WAPDA, NESPAK, TPE of Ukraine and GSC made it more challenging to keep the quality of work up to its highest level. The interaction of these agencies provided FWO an excellent exposure to the work of international level. The civil works included 170 structures of different types, 4.5 KM of cable trenches/ducts/ tunnels, sewerage line of 1.5 KM, Internal roads of 7 KM and approximately 2000 foundations in different sizes.
متعلقہ مضامین
-
Pakistan expects incoming Chinese envoy to promote business ties, boost CPEC
-
TTS faculty decries HEC ‘failure’ to resolve their issues
-
SC accepts appeal by Daniel Pearl’s family against Sheikh’s acquittal
-
Not registering an FIR tantamount to helping the oppressor: IGP
-
Pakistan will not ‘back off’ from facilitation of Afghan peace: FM
-
Blast at iron scrap dealer’s junkyard kills 5 in Nowshera
-
Opp submits requisition to convene PA session to discuss Shehbaz’s arrest
-
Blast at iron scrap dealer’s junkyard kills 5 in Nowshera
-
NAB granted 14-day physical remand of Shehbaz Sharif
-
Soldier martyred in firing by terrorists in Waziristan: ISPR
-
Indian army martyrs soldier, teenage boy along LoC
-
Pakistan spending $10bn per annum for debt repayment