The Project includes construction of 3 oil fred steam operated units of 210 MW each. Muzaffargarh being in the seismic zone, the design of monstrous powerhouse and other buildings was more complex and complicated. The four tier inspections and supervision by WAPDA, NESPAK, TPE of Ukraine and GSC made it more challenging to keep the quality of work up to its highest level. The interaction of these agencies provided FWO an excellent exposure to the work of international level. The civil works included 170 structures of different types, 4.5 KM of cable trenches/ducts/ tunnels, sewerage line of 1.5 KM, Internal roads of 7 KM and approximately 2000 foundations in different sizes.
متعلقہ مضامین
-
Shell Pakistan organises Shell Eco-Marathon for students
-
Fawad Chaudhry asks media to carefully deal with fake news
-
Over 2.95m women in IIOJK anemic, underweight: study
-
Balochistan govt to issue Kissan Cards
-
Alvi stresses global paradigm shift to save mankind from hunger
-
KP starts recruitment process for SSU CPEC police
-
TMUC hosts ‘GEN D Nurturing the Digital Pakistan’ symposium
-
Flights operation resumed at Lahore Airport
-
Pakistan introduces new social media rules to remove unlawful content
-
Flights operation resumed at Lahore Airport
-
Abro flays PTI govt over non-transfer of EOBI to provinces
-
Afghan government urges PIA to resume flight operation