The Project includes construction of 3 oil fred steam operated units of 210 MW each. Muzaffargarh being in the seismic zone, the design of monstrous powerhouse and other buildings was more complex and complicated. The four tier inspections and supervision by WAPDA, NESPAK, TPE of Ukraine and GSC made it more challenging to keep the quality of work up to its highest level. The interaction of these agencies provided FWO an excellent exposure to the work of international level. The civil works included 170 structures of different types, 4.5 KM of cable trenches/ducts/ tunnels, sewerage line of 1.5 KM, Internal roads of 7 KM and approximately 2000 foundations in different sizes.
متعلقہ مضامین
-
Fawad Chaudhry asks media to carefully deal with fake news
-
European MPs assure Sarwar of support on GSP Plus extension
-
US Charge’ d’Affaires, consul general visit Wazir Khan mosque
-
IGP for strict security arrangements on Eid Milad-un-Nabi
-
KP starts recruitment process for SSU CPEC police
-
Balochistan govt to issue Kissan Cards
-
Vehicle used in Gojra gang-rape case seized: police
-
Flights operation resumed at Lahore Airport
-
Flights operation resumed at Lahore Airport
-
Afghan government urges PIA to resume flight operation
-
Pakistan introduces new social media rules to remove unlawful content
-
Marking ‘black day’, Kashmiri body urges world powers to end India’s occupation of Kashmir