National Highway Authority(NHA) on Wednesday completed all arrangements for snow removal on Islamabad-Muzaffarabad dual carriage way. Keeping in view, rain and snowfall forecast in Murree by Pakistan Meteorological Department(PMD), NHA have dispatched required machinery and personnel to the most affected areas. The Chairman NHA and relevant authorities were personally supervising the entire process.
متعلقہ مضامین
-
Covid-19: Pakistan reports 1,293 new cases in last 24 hours
-
A man on his way to Saudi Arabia detected with heroine at Islamabad Airport
-
Dollar reaches Rs176.90 in interbank trading after losing two paisas in value
-
Gang of female blackmailers booked in Hafizabad
-
Flights now allowed to land at Lahore Airport
-
Karachi’s coronavirus positivity ratio raises to 10.25%
-
Karachi’s coronavirus positivity ratio raises to 10.25%
-
Hazrat Fatima (AS) a role model for Muslim women: Dr Noor-ul-Haq Qadri
-
Haleem for society’s collective efforts to deter cases of child abuse
-
Border fencing issue to be resolved through talks, diplomatic channels
-
Border fencing issue to be resolved through talks, diplomatic channels
-
Fawad seeks world intervention on UNSC resolutions on Kashmir