The Project includes construction of 3 oil fred steam operated units of 210 MW each. Muzaffargarh being in the seismic zone, the design of monstrous powerhouse and other buildings was more complex and complicated. The four tier inspections and supervision by WAPDA, NESPAK, TPE of Ukraine and GSC made it more challenging to keep the quality of work up to its highest level. The interaction of these agencies provided FWO an excellent exposure to the work of international level. The civil works included 170 structures of different types, 4.5 KM of cable trenches/ducts/ tunnels, sewerage line of 1.5 KM, Internal roads of 7 KM and approximately 2000 foundations in different sizes.
متعلقہ مضامین
-
Pakistan will ‘never be up for sale’: NSA
-
Pakistan, Iran have direct stake in Afghanistan’s stability: PM
-
Eid Miladun Nabi celebrations to be greater in history of Pakistan: PM
-
Wanted terrorist Arif Ullah killed in Mirali IBO: ISPR
-
FIA detains Lahore student for waving toy pistol in college
-
Dengue cases in Karachi surge to 303
-
Woman waiting for rickshaw gang-raped in Chakwal
-
T20 World Cup: Babar Azam-led squad leaves for Dubai
-
250,000 jobs created under Naya Pakistan Housing Authority: PM
-
COVID-19: 27 deaths,1,086 new cases in a day
-
CM Jam Kamal to meet PM Imran today
-
Fawad, Qadri chair meeting to review arrangements for events of Eid Milad