The Project includes construction of 3 oil fred steam operated units of 210 MW each. Muzaffargarh being in the seismic zone, the design of monstrous powerhouse and other buildings was more complex and complicated. The four tier inspections and supervision by WAPDA, NESPAK, TPE of Ukraine and GSC made it more challenging to keep the quality of work up to its highest level. The interaction of these agencies provided FWO an excellent exposure to the work of international level. The civil works included 170 structures of different types, 4.5 KM of cable trenches/ducts/ tunnels, sewerage line of 1.5 KM, Internal roads of 7 KM and approximately 2000 foundations in different sizes.
متعلقہ مضامین
-
YDA Bhakkar demands ICU on emergency basis
-
YDA Bhakkar demands ICU on emergency basis
-
T20 World Cup: Babar Azam talks in favor of changes in squad
-
2.4 million more doses of Pfizer vaccine arrive in Pakistan
-
Covid-19 tally reports national positivity ratio below 2%
-
Aiwan-e-Sadr shares documentary on twitter on Green Presidency Initiative
-
Covid-19 tally reports national positivity ratio below 2%
-
Mehfil-e-Sama’ being organized in D-Chowk: Gill
-
Pakistan reduced 20 percent GHG emissions from available resources: Amin
-
Public service agenda will continue with more speed: CM
-
CPWB rescues 126 beggar kids
-
GIG national ranking Snooker Championship begins