The new Gwadar International Airport (NGIA), the $246m greenfield airport being built at an area of 4,300 acres would be operational by September 2023. According to the official source, the passenger terminal building of the project would be completed by June 2023; work related to air traffic control by March 2023, while the overall construction of the airport would be finished before September 2023. The New Gwadar International Airport (NGIA) was being managed and operated by Civil Aviation Authority (CAA). To be owned by a joint venture between Pakistan, Oman, and China, the airport would handle domestic and international operations. The airport development is a part of China-Pakistan Economic Corridor (CPEC) development, which was a cornerstone of China’s One Belt One Road (OBOR) initiative. The biggest in Pakistan and would also become the nation’s second airport capable of handling A380 aircraft upon its commissioning in 2022.
متعلقہ مضامین
-
KKH maintenance work to start within a week: Mushtaq Ghani
-
FIR registered against UAF ex-VC, registrar
-
TTS faculty decries HEC ‘failure’ to resolve their issues
-
Tailgating or tolerance — Your weapon of choice to win the race?
-
SC accepts appeal by Daniel Pearl’s family against Sheikh’s acquittal
-
Shehbaz Sharif’s arrest will only ‘add fuel to the fire’: Maryam
-
Pakistan will not ‘back off’ from facilitation of Afghan peace: FM
-
Indian army martyrs soldier, teenage boy along LoC
-
Blast at iron scrap dealer’s junkyard kills 5 in Nowshera
-
WHO chief lauds Pakistan’s strategy to fight Covid-19
-
NAB granted 14-day physical remand of Shehbaz Sharif
-
Pakistan registers protest with Indian diplomat over ceasefire violation